0102030405
LL light-duty slurry pump
Important design features of Lianran pumps include
Heavy-duty structure with through-bolt design for easy maintenance and reduced downtime
Ductile iron fully lined casing provides durability, strength and long life
Large-diameter, low-speed, high-efficiency impellers extend wear life
Large, open internal passageways reduce internal speeds, maximizing service life and reducing operating costs
Unique impeller design for the most difficult froth applications
Minimal shaft / impeller overhang reduces shaft deflection and extends packing life
Cartridge bearing assemblies can be maintained in a clean environment without disassembling the pump for reliable operation and prolonged bearing life
Typical Applications
Electric Factory Coal Preparation
Coal Washing
Chemical Medium Processing
Effluent Handling
Salt and Sugar Industry
Sand And Gravel Handling
Thickener & Tailings
Power Generation
Mineral Processing (coal, copper, gold, iron ore, nickel, oil sands, phosphate)
We strictly adhere to the ISO9001 Standard and CE Certificate and other industry standards as requests.
We have Inspection center, which has the mechanical laboratory,chemical laboratory,measuring chamber of surveying and mapping,and others.We have about 20 sets of cutting-edge equipment, including metal material testing, quality control monitoring of the production process, calibration of measuring instruments, product research, and development of surveying and mapping missions.
We installed a number of checkpoints along the entire production line, including ones for material analysis, spare testing, pump testing, surface and heat treatment checking, charging material, raw material, and more.
About the Pump Testing,the hydraulic performance test station we uses computer to complete the form test and the factory test.Test Bench Test System using the computer to accomplish the automatic control,automatic collection test parameters and real-time processing,the test data contains the whole test process of all kinds of pump and motor and test report could be output once the test finished.